21

Setting up the system

Preinstallation requirements

Selecting a site

Before unpacking and installing the system, select a suitable site for the system for maximum efficiency. Consider the following factors when choosing a site for the system:

Near a grounded power outlet

Clean and dust-free

Stable surface free from vibration

Well-ventilated and away from sources of heat

Secluded from electromagnetic fields produced by electrical devices such as air conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

Acer Altos G510 series system

Acer Altos G510 series User’s guide

Acer EasyBUILDTM

Acer Altos G510 series Accessory box

System keys (attached to the rear panel of the system)

If any of the above items are damaged or missing, contact your dealer immediately.

Save the boxes and packing materials for future use.

Page 31
Image 31
Acer G510 series Setting up the system, Preinstallation requirements, Selecting a site, Checking the package contents