114

Appendix B: Altos G510 Rack Installation Guide

Do the same thing with the other rack bracket.

5Attach the inner rails to the top and bottom (sides) of the server with the release catches toward the front of the system.

(1)Align the inner rail to the five screw holes located on the bottom of the server.

(2)Secure the rail to the server using #8-32 (1 on page 113) screws.

Attach the other inner rail to the top side of the server.

Page 124
Image 124
Acer G510 series manual Appendix B Altos G510 Rack Installation Guide