Chapter 2

Disassembly& Assembly Process

2-1 Equipment Needed & Product Overview

1.Screw Bit (+) :107

2.Hex Sleeves 5mm

3.Long Nose Nipper

4.Screw Bit (+) :102

5.Hex Sleeves 7mm

6.Tweezers

7.P3150/P3250/P3150 refresh/P3250 refresh/P3251 unit

*Before you start: This process is protective level II. Operators should wear electrostatic chains.

*Note: 1. If you need to replace the main board, you have to get into service mode and record the lamp usage hour. please refer to section 2-21.

2.The disassembly and assembly process for P3150/P3250/P3150 refresh/P3250 refresh/ P3251 is the same. Here, we take P3250 as an example.

P3150/P3250/P3150 Refresh/P3250 Refresh/P3251

Confidential

 

 

2-

Page 25
Image 25
Acer P3150 REFRESH, P3250 REFRESH service manual Disassembly& Assembly Process, Equipment Needed & Product Overview