Module Assembly Key Point - Optical Engine
1. Light Pipe Module assembly and overfill alignment
1.1Assembly LP Module to HSG DMD
i.Assembly two Overfill adjustment screws to HSG DMD (Fig.
**Adjustment criteria refer to below item (Fig.
ii.Assembly “Clip LP” and lock with screw well (Fig.
iii.Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig.
iv.Placed LP Module on LP datum of “DMD HSG” and adjustment screw well, shown
v.(Fig.
vi.Assembly “Baffle LP” first (Fig.
vii.When Lock the screw of Baffle LP, the hand must push the left corner of Baffle LP before (Fig.
viii.Lock the screw of Baffle LP well then release the hand (Fig.
1.2Overfill Adjustment @ LP Module
Overfill Adjustment Criteria:
i.
ii.Alignment Sequence:
a.To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical Adjustment Screw”.
b.Refer to Fig.
1.3For Overfill
a.Those 2 Adjustment Screws must be released closely to the
b.ollow adjustment steps shown in Item
Overfill Vertical
Adjustment Screw
Overfill Horizontal
Adjustment Screw
Fig.
46