Inside of the SAB Cap there are the pins of following connections:
power supply
data link to the serial interface RS232
The codes to order the SAB Cabs and preassembled cables are listed below:
ID 70212 SAB-Cab incl. one PG9 cable pipe and 5 wire cable (standard cable)
ID 70213 SAB-Cab incl. one PG9 cable pipe and 5 wire cable / Sub D 9 Connector
(Service Cable)
ID 70221 SAB-Cab incl. one PG9 cable pipe
ID 70215 SAB-Cab incl. two PG9 cable pipes
ID 70219 SAB Cab without any cable pipe. The cabling is done by the customer himself.
4.3.1 Allowed Diameter of the Used Cables
The allowed diameters of the cables used for data link and power supply must be in the range
from 3,5 to 8mm. For this case, IP 65 is reached.
4.3.2 Assembling of the Cable Pipe
If no preassembled SAB Cab are used (Best-Nr. ID 70214), the assembling must be done in
following way:
Breakthrough the prepared areas at the surface of the SAB Cabs. There are two prepared
areas seen at the SAB Cab: central and at one side of the cab.
The sealing must be done in the correct way O-Ring (3) at the cable pipe (4) (see also
Figure 4-1.
1
2
3
4
Figure 4-1:Assembling oft the Cable Pipe
Bring the nut (2) of the cable pipe inside of the SAB Cab (1).
To fasten the nut please use the right tool (17mm)..