MAINTENANCE

MAINTENANCE

HYDRAULICS

General

The INTERSTATER hydraulic system consists of two circuits. The power circuit drives the cuttershaft. The control circuit lifts and tilts the cutter unit.

A tractor with a cutter unit installed on each side will have two independent power circuits with two sets of lift and tilt cylinders, and one control circuit with a four-section control valve (instead of a two section valve).

NOTE: It is important that pipe thread sealant be used on solid connections only; never on connections between swivel fittings or fittings with “O” rings and straight threads. Use pipe thread sealing compound. DO NOT substitute other types of sealant, such as teflon tape, paint, shellac, etc.

Initial Start-Up Procedures

Whenever the hydraulic system is drained in order to service a hydraulic component, the following start-up procedure should be completed.

1.Check all nuts and hex head capscrews to be sure they are tight and that all lock washers are fully compressed.

2.Check all hoses and hydraulic connections to be sure that they are tight.

3.Inspect all moving parts, and make certain that no wires or hoses will be caught or pinched when the tractor is in operation.

Secure all wires and hoses.

4.Thoroughly lubricate the INTERSTATER. Refer to SECTION 2, Illustration 4.

5.Change the hydraulic filter and fill the reservoir to the sight glass with new hydraulic oil. Refer to SECTION 1 for specifications.

Remove all objects from, and stand clear of the front of the cutter unit. DO NOT GET NEAR ROTATING KNIVES.

6.Turn mowers off, then start tractor and run engine at low idle. Operate the lift and tilt circuits, and the power circuit (turn cutter units on ONLY when mowers are fully lowered). Operate until the system is fully charged. Recheck the fluid level and add oil, if necessary. If undue noise continues after the system is fully charged, stop the unit and determine the cause.

7.After the hydraulic system is fully charged and functioning properly, switch the mowers on and increase the engine speed to run the PTO at 540 RPM. Maintain this speed for 5 minutes and look for any leaks or possible problems.

INTERSTATER 03/09

Maintenance Section 5-12

© 2009 Alamo Group Inc.

Page 166
Image 166
Alamo FC-FL-0001, 803213C manual General, Initial Start-Up Procedures