Allied Telesis AT-X210-16GT, AT-X210-9GT Mounting an AT-x210-16GT Switch in an Equipment Rack

Models: AT-X210-16GT AT-X210-24GT AT-X210-9GT

1 66
Download 66 pages 11.41 Kb
Page 41
Image 41

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

6.Mount an AT-x210-16GT switch in a 19-inchequipment rack using the provided spacer bracket mounts with four equipment rack screws (not provided with the switch), as shown in Figure 20.

RESET FAULT

STANDBY

POWER

CONSOLE

 

 

 

 

 

 

 

 

 

MODE

 

L/A

 

 

 

 

RS-232

SELECT

SPEED

1

MODE

LINK/

 

 

 

 

 

 

3

 

SPEED/

ACT

 

 

 

 

DUPLEX

 

5

7

DUPLEX

 

 

 

 

4

 

9

11

 

 

 

 

 

2

 

 

 

 

 

 

 

 

6

8

13

15R

L/A

 

 

 

 

 

 

 

 

 

 

 

10

12

 

MODE

 

 

 

 

 

 

 

 

 

 

 

 

 

14

16R

L/A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODE

1

3

5

7

2 9

4 11

6 13

8 15R

10 12 14 16R

L/A

15

LINK/ 16 ACT

ATGi -

 

 

x210

 

gabit

-

Ether

 

 

16GTtch

15 SFP

net Swi

 

 

 

 

16

Figure 20. Mounting an AT-x210-16GT Switch in an Equipment Rack

31

Page 41
Image 41
Allied Telesis AT-X210-16GT, AT-X210-9GT, AT-X210-24GT manual Mounting an AT-x210-16GT Switch in an Equipment Rack