AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

6.Verify that the handle on the transceiver is in the upright position, as shown in Figure 30. This secures the transceiver and prevents it from being dislodged from the slot.

R

R

SFP Transceiver

Handle

1983

Figure 30. Positioning the SFP Handle in the Upright Position

7. Eject SFP transceivers, as shown in Figure 31. First lower the SFP Transceiver Handle, then gently remove the SFP Transceiver.

15R

16R

L/A

 

15

 

16

LINK /

ACT

 

AT-x210-

16GT

Gigabit

Ethernet

 

Switch

 

SFP

 

15

 

 

 

 

16

CLASS 1

LASER PRODUCT

Figure 31. Ejecting an SFP transceiver after lowering the SFP Handle to

the Downwards Position

8. Repeat steps 2 through 6 to install additional SFP transceivers.

37

Page 47
Image 47
Allied Telesis AT-X210-16GT, AT-X210-9GT, AT-X210-24GT manual SFP Transceiver Handle