Allied Telesis AT-X210-16GT, AT-X210-9GT, AT-X210-24GT Monitoring the Initialization Processes

Models: AT-X210-16GT AT-X210-24GT AT-X210-9GT

1 66
Download 66 pages 11.41 Kb
Page 53
Image 53

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

Monitoring the Initialization Processes

It takes about thirty seconds for the switch to initialize its management software programs and features, and load the default configuration.

You may also monitor the bootup sequence by connecting a terminal or computer that has a terminal emulator program, to the Console port on the master switch. You will see the messages in Figure 34 here to Figure 36 on page 45.

Bootloader 2.0.10

loaded

 

 

 

 

Press <Ctrl+B> for the Boot Menu

 

 

 

Reading filesystem...

 

 

 

 

Loading flash:x210-5.4.3.rel

 

 

 

Verifying release... OK

 

 

 

 

Booting...

 

 

 

 

 

Starting base/first...

 

[

OK

]

Mounting virtual filesystems...

[

OK

]

 

______________

____

 

 

 

 

/\ \

/ /______\

 

 

 

/

\ \_

__/ / ______

 

 

 

/

\

/

______

 

 

 

/

\ \

/ /

\ ____ /

 

 

 

/______/\____\ \/ /____________/

 

 

 

Allied Telesis Inc.

 

 

 

 

AlliedWare Plus (TM) v5.4.3

 

 

 

Current release filename: x210-5.4.3.rel

 

 

 

Original release filename: x210-5.4.3.rel

 

 

 

Built: Tue Jul 9 18:20:42 NZST 2013 by: maker@maker04-build

 

 

Mounting static filesystems...

[

OK

]

Checking flash filesystem...

[

OK

]

Mounting flash filesystem...

[

OK

]

Checking NVS filesystem...

[

OK

]

Mounting NVS filesystem...

[

OK

]

Starting base/dbus...

 

[

OK

]

Starting base/syslog...

 

[

OK

]

Figure 34. Switch Initialization Messages

43

Page 53
Image 53
Allied Telesis AT-X210-16GT, AT-X210-9GT manual Monitoring the Initialization Processes, Switch Initialization Messages