Allied Telesis AT-X210-24GT, AT-X210-9GT manual Mounting an AT-x210-9GT Switch in an Equipment Rack

Models: AT-X210-16GT AT-X210-24GT AT-X210-9GT

1 66
Download 66 pages 11.41 Kb
Page 43
Image 43

AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide

9.Next attach the cable tray brackets for AT-x210-9GT switches, as shown below in Figure 23.

Figure 23. Attaching cable tray brackets for an AT-x210-9GT

10.Mount an AT-x210-9GT switch in a 19-inch equipment rack, as shown below in Figure 24, using the screws from the rubber feet after removing these screws, as shown earlier in Figure 15.

RESET

FAULT

 

 

POWER

STANDBY

CONSOLE

 

 

RS-

MODE

232

SELECT

SPEED

 

 

DUPLEX

L/A MODE

1

2

LINK/ SPEED/

3

5

4

6

ACT

 

DUPLEX

7

L/A

 

MODE

8

L/A

 

MODE

1

3

5

7 2

4

6

8

L/A

ATGi -

 

x210

gabit

-

Ethernet

 

Sw9GTitch

SFP

LINK/

 

ACT

 

 

9

Figure 24. Mounting an AT-x210-9GT Switch in an Equipment Rack

33

Page 43
Image 43
Allied Telesis AT-X210-24GT, AT-X210-9GT, AT-X210-16GT manual Mounting an AT-x210-9GT Switch in an Equipment Rack