![](/images/new-backgrounds/1193088/19308883x1.webp)
Chapter 2: Installation
7.For
Figure 21. Fitting rack mount handles to the brackets for an AT-x210-9GT
8.After fitting the rack mount handles to the brackets using the supplied M3x6mm pan head screws , as shown about in Figure 21, fit these brackets with handles to the mounting for AT-x210-9GT switches using the supplied M4x6mm countersunk screws, as shown below in Figure 22.
Figure 22. Fitting brackets to the mounting for an AT-x210-9GT
32