Allied Telesis AT-X210-24GT, AT-X210-9GT, AT-X210-16GT manual Installation

Models: AT-X210-16GT AT-X210-24GT AT-X210-9GT

1 66
Download 66 pages 11.41 Kb
Page 52
Image 52

Chapter 2: Installation

Warning

Power cord is used as a disconnection device. To de-energize equipment, disconnect the power cord.  E3

Pluggable Equipment. The socket outlet shall be installed near the equipment and shall be easily accessible.  E5

4.Verify that the POWER LED is green. If the LED is OFF, see Chapter 3, “Troubleshooting” on page 47.

The switch is now powered on and ready for network operations. For information on how to manage the switch, see the following manual:

„AlliedWare Plus Software Reference for x210 Series Switches

42

Page 52
Image 52
Allied Telesis AT-X210-24GT, AT-X210-9GT, AT-X210-16GT manual Installation