American Power Conversion VT ISX manual Voltage confirmation

Models: VT ISX

1 36
Download 36 pages 25.44 Kb
Page 34
Image 34
Voltage confirmation

Restart – Parts Replacement

Voltage confirmation

At the restart, the display will prompt you through the following screens:

Confirm Voltage

Use 400V

Yes, use 400V

No, select another

When the Confirm Voltage prompt appears on the screen, select desired voltage and press ENTER.

Apply load?

Yes

No

When the prompt Apply load appears, select Yes if you want the UPS to provide a load output now. (If you do not want a UPS load output at this point, select No).

Chrg xxx%

Load xxx%

xxxVin xxxVout xxHz Runtime: xxhr xxmin

Status screen

LOAD ON LED is now lit, and the display will show the Confirm Menu Screen.

The UPS is now ready to support the load.

Note

Auto-detection on frequency – if a problem occurs call APC Customer Support.

Note

Reinstall cable landing cover plates.

For any optional equipment, refer to product-specific manuals.

28

Smart-UPS® ISX 30-40 kVA, 400V Operation

990-2820A

Page 34
Image 34
American Power Conversion VT ISX manual Voltage confirmation