Start-up is included with the UPS, and the start-up procedure described here is only applicable if the UPS requires a subsequent start-up.

Note

Power application

Only trained personnel familiar with the construction and the equipment may carry out the restart procedure.

Warning

Set the utility breaker to the ON position.

If your installation includes an XR Battery Enclosure (SUVTBXR2B6/SUVTBXR6B6) with a DC disconnect switch, set the DC disconnect switch to the ON position.

Wait approximately 30 seconds for the system to boot up and carry out self test.

Note

After system boot-up, the display will automatically prompt you on how to confirm/select voltage and frequency as shown in the following.