American Power Conversion VT ISX manual How to install a Battery Module

Models: VT ISX

1 36
Download 36 pages 25.44 Kb
Page 28
Image 28
How to install a Battery Module

Configuration – Parts Replacement

To release the battery from the lock mechanism, one person gently pushes the battery upwards again and pulls it out, while the other person supports the battery.

How to install a Battery Module

If additional batteries are needed for extra run-time, or if you install battery replacement modules etc., follow the below procedure:

Wait until you are ready to power up the system before installing Battery Modules in the UPS. Failure to do so can result in a deep discharge of the batteries and cause permanent damage (the time from the battery installation time till the UPS is powered up should

Caution

not exceed 72 hours or 3 days).

 

BATTERY UNIT

Manual backgroundManual background

BATTERY UNIT

Install the Battery Modules in the lowest available bay.

Position the Battery Unit to slide in between the grooves and push completely into the UPS to ensure connection.

If a problem is reported, ensure that the modules in question are correctly installed. If the problem persists, refer to the Troubleshooting section of this guide.

Allow for a 24-hour recharging period of the batteries after system start-up / battery replacement for battery monitoring data to become fully reliable.

Note

22

Smart-UPS® ISX 30-40 kVA, 400V Operation

990-2820A

Page 28
Image 28
American Power Conversion VT ISX manual How to install a Battery Module