APWeb – Initial Setup by Network Admin
5.Enter the new password in the New Password field, and confirm by reentering it in the next field.
6.Click Submit.
7.Repeat Steps 3 through 6 for the Admin Account Login, entering super as both the user name and password under Change Administration Account Login.
Executing a Test Switch with the XBar
We recommend executing a test switch with the XBar Controller (see below) or with BCS commands (see page 73).
Before executing the test switch, make sure the first source device and the first destination device are connected to the input and output connectors as indicated in the “Octaire AutoPatch Connector Guide.” (Depending on the signal and connector type, you may need to attach more than one input and output for a signal (e.g., a Y/c signal will be routed over a BNC connector on the enclosure that routes “Y” and over the corresponding BNC connector on the enclosure that routes “c”).
Note: For complete information on the XBar Controller, see page 82.
The test switch below routes Input (source channel) 1 to Output (destination channel) 1 on VM 0 (the All routing level of
To execute a test switch with the XBar:
1.Install the Java
2.From any page in the site, click the Controller link. The XBar launches.
VM title block
(click to select routing levels)
Click crosspoint for test switch
3.Click the blue crosspoint for routing Input 1 to Output 1. (Inputs are on the left; outputs are across the top.)
The blue crosspoint image turns red as the switch is routed.
*The Java
To disconnect the test switch:
1.Click the red crosspoint. The red crosspoint image turns blue as the test switch is disconnected.
72 | Octaire Instruction Manual |