"Monitor" alphanumeric display (cont.)

Voltage measurements

These measurements may be accessed in two manners:

Display of voltage measurements

pressing the "V" button displays the series of screens in the figure opposite;

in "Monitor" multi-cubicle mode, pressing the ">" button when the screen already displays the voltage measurements of a cubicle.

The system shifts to the voltage measurements of the next cubicle.

Note:

Mains 2 measurements are not

displayed on converters and parallel UPS with SSC;

Mains 1 and inverter output measurements are not displayed on Static Switch Cubicles.

Caution:

For installations comprising a number of modular UPSs connected in parallel, the absence of load (UPS output) voltage indicated on a display is only valid if it also indicated on the displays of all the other parallel-connected UPSs. Before carrying out any work on a UPS, always check the absence of voltage using a method complying with applicable safety rules for work on electrical equipment.

V

MNS.1

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

V1

V2

V3

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

U12

 

U23

U31

V RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Direct access to the function by pressing the "V" button.

Mains 1 input phase-to-phase voltages in V rms (RC input).

Mains 2 input phase-to-neutral voltage in V rms.

Mains 2 input phase-to-phase voltages in V rms.

Inverter output phase-to-neutral voltage in V rms.

Inverter output phase-to-phase voltages in V rms.

Load phase-to-neutral voltage in V rms.

Load phase-to-phase voltages in V rms.

V

Current measurements

These measurements may be accessed in two manners:

Display of current measurements

pressing the "A" button displays the series of screens in the figure opposite;

in "Monitor" multi-cubicle mode, pressing the ">" button when the screen already displays the current measurements of a cubicle.

The system shifts to the current measurements of the next cubicle.

Note:

Mains 2 measurements are not displayed on UPS cubicles in parallel UPS systems;

Mains 1 and inverter output measurements are not displayed on Static Switch Cubicles.

A

MNS.1

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MNS.2

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INV.

 

 

I1

I2

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

 

I1

I2

 

 

 

I3

A RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

I LOAD

/ IN

 

 

 

 

 

 

 

 

 

 

=

 

 

%

 

 

(IN =

 

 

 

 

A)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOAD

 

 

I1

I2

 

 

 

I3

PEAK F.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Direct access to the function by pressing the "A" button.

Currents of the three phases at Mains 1 input in A rms (RC input).

Currents of the three phases at Mains 2 input in A rms.

Currents of the three phases at inverter output input in A rms.

Currents of the three load phases in A rms.

Percentage of the current drawn on the most heavily loaded load phase with regards to the rated current (in parentheses).

Peak factor for each phase of the load current with regards to a sine current.

A

Page 42 - 6739380EN/JC

Page 42
Image 42
APC 6739380EN/JC user manual Voltage measurements, Current measurements, Display of voltage measurements