USER’S GUIDE switched rack pdu
®
Selecting a menu to perform a task
•To do the following, see Switched Rack PDU Settings:
–Configure the overload thresholds for each phase
–Configure the Overload Outlet Restriction for each phase
–Set the Name, Location, and Coldstart Delay for this device
•To do the following, see Outlet Settings:
–Apply power to and remove power from the outlets
–Set Power On Delay, Power Off Delay, and Reboot Duration for the outlets
–Set the names and associated web links for the outlets
•To do the following, see
–Access the event log
–Configure the actions to be taken based on the severity level of an event
–Configure SNMP Trap Receiver settings for sending
–Define who will receive
–Test
•To do the following, see Network Menu:
–Configure new TCP/IP settings for the PDU
–Identify the Domain Name Service (DNS) Server and test the network connection to that server
–Define settings that affect FTP, Telnet, the Web interface, SNMP, and
•To do the following, see System Menu:
–Control Administrator and Device Manager access
–Manage Outlet User access
27