Argosy Research H-125 Series owner manual Cycle Sequence, Brine Reclaim, Cs Cs

Models: H-125 Series

1 40
Download 40 pages 39.84 Kb
Page 15
Image 15
CYCLE SEQUENCE

CYCLE SEQUENCE

Anytime cycle sequence is modified, softener set-up will revert to manufacturer setting and must be reprogrammed as desired.

Cycle Sequence instructions allows the operator to set the order of the cycle. The Softener System Setup allows the operator to set how long the cycles will last. The operator may choose up to 9 cycles in any order.

END must be used as the last cycle option. The SERVICE cycle should only be used in brine prefill applications to allow salt to dissolve.

Cycle Options

BACKWASH

REGENERANT

FILL

DRAW-DN

RINSE

SOFTENING

END

 

 

 

The following is an example of how to set a valve so that when regeneration is initiated, BACKWASH occurs first, regenerant draw DN occurs second, RINSE occurs third, and FILL occurs fourth.

 

STEP 1 CS – Press NEXT and simultaneously for five seconds or until display changes and

Step 1CS

 

release. Then press NEXT and simultaneously again for 5 seconds and release. If screen in

 

 

step 2CS does not appear in 5 seconds the lock on the valve is activated.

SET 1.25

AUX VALVE CONTROL SET OFF

Step 2CS

Step 3CS

STEP 2 CS Meter Size. Use the or to select from 1.0", 1.25", 1.50", 2.0" meter. H125 is a 1.25" meter. It is necessary to select meter size to coincide with control valve size used. Press NEXT to go to Step 3C.

STEP 3CS – Use the or to select on of the following:

OFF; or

Brine Reclaim – Step 4CS; or

Twin Alternating System – Step 6CS; or

No Hard Water Bypass During Regeneration – Step 7CS.

Factory Setting is OFF

Brine Reclaim: When Reclamation Mode is ENABLED, a portion of the unused brine is diverted after it has passed through the resin bed. Brine discharge contains unused salt that can be used for brine make-up for the next regeneration. A motorized alternator valve (MAV) must be connected to the two-pin connector labeled ALTERNATOR DRIVE located on the circuit board or error code 106 will result. The MAV diverts the brine discharge to brine tank. A-Port discharges to brine tank. B-Port discharges to drain. Start time and duration settings are for specified pressures, if variation occurs on site, elution study can be done to provide settings that optimize salt savings without sacrificing capacity. For detailed instructions, see Brine Recovery instructions (73-355-BR).

Programming needed for Brine Recovery: 1. Start Time

2. Duration

3. Lower Salt Setting

 

 

BRINE RECLAIM

 

 

 

start time / duration / salt setting - 10 lbs./ft3

 

Water Pressure

H125-32-10

H125-48

H125-64

 

35 PSI

40:00/10:00/2.0

40:00/12:00/3.3

46:00/11:00/4.2

 

45 PSI

36:00/8:45/2.0

38:00/11:00/3.3

44:00/11:00/4.3

 

55 PSI

33:00/8:30/2.0

36:00/11:00/3.3

41:00/8:30/4.0

 

65 PSI

32:00/7:45/2.0

35:00/9:45/3.0

40:00/7:40/4.0

 

 

 

 

 

 

 

 

 

 

 

start time / duration / salt setting - 10 lbs./ft3

 

Water Pressure

H125-96

H125-128

H125-160

H125-192

35 PSI

46:00/13:00/6.0

48:00/12:00/8.0

50:00/12:00/10.3

50:00/10:00/12.0

45 PSI

44:00/11:00/6.5

46:00/11:00/8.0

48:00/10:00/10.3

48:00/9:30/12.0

55 PSI

41:00/10:40/6.0

43:00/9:45/8.0

45:00/9:40/10.0

45:00/8:30/12.0

65 PSI

40:00/10:00/6.0

42:00/8:55/8.0

44:00/8:55/10.0

44:00/7:50/12.0

 

 

 

 

 

15

Page 15
Image 15
Argosy Research H-125 Series Cycle Sequence, Brine Reclaim, Programming needed for Brine Recovery 1. Start Time, Cs Cs