Page

Manual

14 of

2100

59

-549G

 

 

 

FIELD SUPPLIED DUCT

BOTTOM OF ROOF

TURNING VANES

OR FIXED CEILING

RECOMMENDED

 

SUSPENDED

20"

12"

CEILING

MINIMUM

MINIMUM

 

 

4" MINIMUM FROM

 

 

TOP OF UNIT TO

 

 

DUCT BOTTOM

 

9'-7" MINIMUM

 

 

CLEARANCE

9'-2"

7'-9 3/4"

RECOMMENDED TO

MINIMUM

BOTTOM OF ROOF

REQUIRED

UNIT HEIGHT

OR FIXED CEILING

INSTALLATION

 

 

 

HEIGHT

FLOOR

MIS-2958 B

DUCTED APPLICATION –

FIGURE 7A

BASIC UNIT

 

Page 14
Image 14
Bard I42H1D, I36H1D, I60H1D, I48H1D, I30H1D installation instructions Ducted Application Basic Unit