Page

Manual

16 of

2100

59

-549G

 

 

BOTTOM OF ROOF

 

FIELD SUPPLIED DUCT

 

OR FIXED CEILING

 

TURNING VANES

 

RECOMMENDED

 

 

SUSPENDED

20"

12"

CEILING

MINIMUM

MINIMUM

 

 

4" MINIMUM FROM

 

 

TOP OF UNIT TO

 

 

DUCT BOTTOM

7'-9 3/4"

10'-1" MINIMUM

 

CLEARANCE

9'-8"

UNIT HEIGHT

RECOMMENDED TO

MINIMUM

 

 

BOTTOM OF ROOF

 

REQUIRED

 

OR FIXED CEILING

 

INSTALLATION

 

 

 

 

HEIGHT

FLOOR

6" RISER

MIS-2988 B

FIGURE 7C 6" RISER APPLICATION

Page 16
Image 16
Bard I60H1D, I42H1D, I36H1D, I48H1D, I30H1D installation instructions Riser Application