Baum Bros. Imports 26.4 manual Transport and Installation of the Machine, Place of Installation

Models: 26.4

1 104
Download 104 pages 51.07 Kb
Page 12
Image 12

1.0 Technical Data/Machine Layout/Transport and Installation of the Machine/Safety Relevant Machine Elements

Transport and Installation of the Machine

Have the machine installed by BAUM service personnel, exclusively!

The installation of the machine requires special skills which can be guaranteed only by especially trained experts of BAUM agencies. Arbitrary working on the machine may damage the machine itself or other material property of the user or cause accident endangering life and limb of the staff.

The machine must be unpacked, moved, transferred and installed by authorized BAUM Service Technicians only. Dangers might arise from the machine itself or from its packing if it is unpacked, moved, transferred or installed with unsuitable devices.

While the machine is unpacked, moved, transferred and installed, no other persons must be present in the range of the machine or its packing.

The BAUM Service Technician must also take care that no unauthorized persons work at the machine, its packing or the installation equipment.

After Unloading

Remove all packing and wrapping material

Check machine and accessories for damages

Check for missing parts

In Case of Complaints

Immediately send written note to:

Railway or shipping company

Insurance company

BAUM / Agency

Place of Installation

The location must meet the following requirements:

Vibration free location

Even concrete flooring, concrete property class min. (N/mm²) according to eurocode 2: C20/25 or according to DIN1045: B 25.

Observe carrying capacity!

Avoid possible accidents of operator by uneven flooring

Adhere to minimum distance from buildings or peripheral equipment (see plan)

After the Installation of the Machine

1.Remove anti rust paint (agent: kerosene, gasoline) from the machine on the site of installation

Note:

Do not use any sharp tools to remove anti-rust paint!

2.Clean plastic covers only with plastic cleansing agent

3.Final check according to check list

4.Have handover signed

K1 - 4

Page 12
Image 12
Baum Bros. Imports 26.4 manual Transport and Installation of the Machine, Place of Installation, Case of Complaints