Buffalo Technology LSV40TL user manual Confirm Operation screen

Models: LSV40TL

1 173
Download 173 pages 60.45 Kb
Page 81
Image 81

Using your LinkStation

Note: If power is turned off during a RAID rebuild, the RAID rebuild will continue when power is restored.

[Confirm Operation] screen

When you perform any of the following tasks, a [Confirm Operation] screen is displayed . To continue, enter the displayed number within 60 seconds and click [Apply].

• Change RAID array (Create/Delete)

• Format Array or Disk

• Delete Folder

• Remove Disk

• Restore Factory Defaults

• Rebuild RAID array

• Format LinkStation

 

LinkStation User Manual

80

Page 81
Image 81
Buffalo Technology LSV40TL user manual Confirm Operation screen