Bunn ITB, TWIN PROGRAMMING THE BREWER cont, PROGRAMMING FUNCTIONS - LEVEL 2 cont, Calibrate Flow?

Models: ITB TWIN

1 39
Download 39 pages 50.34 Kb
Page 25
Image 25

PROGRAMMING THE BREWER (cont.)

PROGRAMMING FUNCTIONS - LEVEL 2 (cont.)

NOTE: If the display is already on the DILUTION CAL screen, skip steps 2-3 and proceed directly to step 4.

2.Press and hold the right hidden switch until the display reads SET LANGUAGE. Press and release the right hidden switch until the display reads

CALIBRATE FLOW?

3.Select YES to advance to SPRAY HEAD CAL screen. Select NO to advance to DILUTION CAL.

4.Select YES.

The display should read CONTAINER READY? If container is under the funnel, select YES.

5.The display should read CALIBRATE DILUTE. Select START to begin the dilution flow for calibration. The display should read CALIBRATE DILUTE...60 SEC TO FINISH. The 60-second timer on the display will count down to zero. When the counter reaches zero, the display will change to DILUTE OZ/M, along with a number.

6.Measure the amount of water in the container and using the (-)and (+), adjust the amount on the display to match the amount in the container. Then select DONE.

7.The display should now read NEW DILUTE FLOW, along with the correct flow rate of the sprayhead. After about 5 seconds, the display will return to the CALIBRATE FLOW screen. To exit programming and return to the MAIN SCREEN, press ENABLE BREW ON/OFF switch.

NOTE: On dual dilution models, left and right dilution calibrations will be shown.

Page 25

41581.2 091609

 

Page 25
Image 25
Bunn ITB, TWIN manual PROGRAMMING THE BREWER cont, PROGRAMMING FUNCTIONS - LEVEL 2 cont, Calibrate Flow?