Carrier 40RMS SPLIT SYSTEMS WITH 40RM/RMQ/RMS UNITS, A. Preliminary Information, B. Pre-Start-Up

Models: 40RM 40RMS 40RMQ

1 44
Download 44 pages 40.6 Kb
Page 43
Image 43
START-UP CHECKLIST

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

LINE

- -

DOTTED

- - - -

ALONG

- - -

CUT

- -

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

LINE

- -

DOTTED

- - - -

CUT ALONG

- - - -

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

 

-

START-UP CHECKLIST

(SPLIT SYSTEMS WITH 40RM/RMQ/RMS UNITS)

A. Preliminary Information

OUTDOOR: MODEL NO.

 

 

 

SERIAL NO.

 

 

INDOOR: MODEL NO.

 

 

 

SERIAL NO.

 

ADDITIONAL ACCESSORIES

 

 

 

 

B. Pre-Start-Up

OUTDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IS THERE ANY SHIPPING DAMAGE?

 

 

 

 

 

 

 

 

 

 

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IF SO, WHERE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WILL THIS DAMAGE PREVENT UNIT START-UP?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE GROUND WIRE BEEN CONNECTED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE COMPRESSOR HOLDDOWN BOLTS BEEN LOOSENED?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONTROLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE THERMOSTAT(S) AND INDOOR FAN CONTROL WIRING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CONNECTIONS MADE AND CHECKED?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE ALL WIRING TERMINALS (including main power supply) TIGHT?

 

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE OUTDOOR UNIT CRANKCASE HEATERS BEEN ENERGIZED FOR 24 HOURS?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

INDOOR UNIT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

ARE PROPER AIR FILTERS IN PLACE?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

DO THE FAN BELTS HAVE PROPER TENSION?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PIPING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40RM,RMQ

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR UNIT COILS AS REQUIRED?

(Y/N)

 

 

 

 

HAVE LEAK CHECKS BEEN MADE AT COMPRESSORS, CONDENSERS, INDOOR COILS,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TXVs (Thermostatic Expansion Valves) SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS

 

 

 

 

 

 

 

WITH A LEAK DETECTOR?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LOCATE, REPAIR, AND REPORT ANY LEAKS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE ALL COMPRESSOR SERVICE VALVES BEEN FULLY OPENED (BACKSEATED)?

(Y/N)

 

 

 

 

 

 

 

 

ARE THE COMPRESSOR OIL SIGHT GLASSES SHOWING CORRECT LEVELS?

 

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40RMS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAS AIR BEEN BLED FROM SYSTEM?

(Y/N)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HAVE LEAK CHECKS BEEN MADE AT COMPRESSORS, CHILLERS, VALVES, AND INDOOR COILS?

 

 

(Y/N)

LOCATE, REPAIR, AND REPORT ANY LEAKS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Manufacturer reserves the right to discontinue, or change at any time, speci®cations or designs without notice and without incurring obligations.

Book

1

4

 

PC 111

Catalog No. 534-053

Printed in U.S.A.

Form 40RM-9SI

CL-1

11-95

Replaces: 40RM-1SI

Tab

3c

2e

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 43
Image 43
Carrier 40RMS, 40RMQ SPLIT SYSTEMS WITH 40RM/RMQ/RMS UNITS, A. Preliminary Information, B. Pre-Start-Up, Start-Upchecklist