Step 3 Ð Field Fabricate Ductwork Ð Secure all ducts to building structure. Use ¯exible duct connectors be- tween unit and ducts as required. Insulate and weatherproof all external ductwork, joints, and roof openings with counter ¯ashing and mastic in accordance with applicable codes.
Ducts passing through an unconditioned space must be insulated and covered with a vapor barrier.
Step 4 Ð Make Unit Duct Connections Ð Unit is shipped for
NOTE: Do not drill in this area; damage to basepan may result in water leak.
Fig. 6 Ð Air Distribution Ð Through-the-Bottom
(48HJ017 and 025 Shown)
NOTE: Do not drill in this area; damage to basepan may result in water leak.
Fig. 7 Ð Concentric Duct Air Distribution
(48HJ017 and 025 Shown)
Step 5 Ð Install Flue Hood Ð Flue hood is shipped secured to a baffle under main control box. To install, secure ¯ue hood to access panel. See Fig. 9.
NOTE: When properly installed, ¯ue hood will line up with combustion fan housing. See Fig. 10.
NOTE: Dimensions A, A , B, and B are obtained from
areas indicate
Fig. 8 Ð Concentric Duct Details
Fig. 9 Ð Flue Hood Location