Carrier 48HJ015-025 Ð Air Distribution Ð Through-the-Bottom, 48HJ017 and 025 Shown

Models: 48HJ015-025

1 32
Download 32 pages 31.84 Kb
Page 7
Image 7
Fig. 6 Ð Air Distribution Ð Through-the-Bottom

Step 3 Ð Field Fabricate Ductwork Ð Secure all ducts to building structure. Use ¯exible duct connectors be- tween unit and ducts as required. Insulate and weatherproof all external ductwork, joints, and roof openings with counter ¯ashing and mastic in accordance with applicable codes.

Ducts passing through an unconditioned space must be insulated and covered with a vapor barrier.

Step 4 Ð Make Unit Duct Connections Ð Unit is shipped for through-the-bottom duct connections. Duct- work openings are shown in Fig. 1, 4, and 5. Duct connec- tions are shown in Fig. 6. Field-fabricated concentric duct- work may be connected as shown in Fig. 7 and 8. Attach all ductwork to roof curb and roof curb basepans.

NOTE: Do not drill in this area; damage to basepan may result in water leak.

Fig. 6 Ð Air Distribution Ð Through-the-Bottom

(48HJ017 and 025 Shown)

NOTE: Do not drill in this area; damage to basepan may result in water leak.

Fig. 7 Ð Concentric Duct Air Distribution

(48HJ017 and 025 Shown)

Step 5 Ð Install Flue Hood Ð Flue hood is shipped secured to a baffle under main control box. To install, secure ¯ue hood to access panel. See Fig. 9.

NOTE: When properly installed, ¯ue hood will line up with combustion fan housing. See Fig. 10.

NOTE: Dimensions A, A , B, and B are obtained from ®eld-supplied ceiling diffuser.

areas indicate block-off pans.

Fig. 8 Ð Concentric Duct Details

Fig. 9 Ð Flue Hood Location

7

Page 7
Image 7
Carrier 48HJ015-025 Ð Air Distribution Ð Through-the-Bottom, 48HJ017 and 025 Shown, Ð Concentric Duct Air Distribution