58HDV

 

EXHAUST

 

INLET

On Some Models

 

 

 

ONLY

 

Plastic Caps (2)

 

 

 

Yellow or black

 

 

 

 

 

Coupling & Clamps

 

 

 

 

(Optional)

 

 

 

 

Vent Drain

 

 

 

 

 

& Clamps

 

VENT

 

Single Pressure Switch

 

 

 

 

 

 

 

 

IN

 

 

ON

 

Dual Pressure Switch Detail

 

 

 

OFF

 

 

 

 

Relief Tube

 

 

 

 

 

Black Rubber 3/

AIR FLOW

 

 

 

16

 

Drain Tee

 

 

(4.8mm) ID

 

 

Drain Tube

 

 

 

 

 

Black Rubber

 

 

 

 

 

1/ (12.7mm) ID &

 

 

 

 

 

2

 

 

 

 

 

Clamps

 

 

 

 

 

Drain Tube

 

 

Street Elbow

 

 

Corrugated

 

 

 

 

 

 

1/ (12.7mm) CPVC

 

5/ (15.9mm) ID &

 

 

2

 

 

8

 

 

(Loose parts bag)

 

 

Clamps

 

 

 

 

Drain Connector Black PVC

 

 

 

 

3/ (18.1mm) PVC X 1/

 

 

 

 

4

2

 

 

 

 

(12.7mm) CPVC (Loose

 

 

 

 

parts bag)

 

 

 

 

 

Casing Grommet

 

 

 

 

 

Black Rubber

 

 

 

 

 

(15.9mm) ID

 

 

 

 

 

(Loose parts bag)

 

 

 

 

 

Drain Line Vent Tee 3/

Drain Tube Black Rubber 5/ (15.9mm) ID &

4

(18.1mm) PVC or 1/ (12.7mm)

8

2

Clamps, Cut length to fit (Loose parts bag)

CPVC (Field supplied)

 

Representative drawing only, some models may vary in appearance.

Fig. 11 - Upflow Installations Top Vent

Upflow Installations Top Vent (See Fig. 11)

25--24--67

A07706

Remove knockout from the side of the furnace casing where drain tube will exit.

Install casing grommet [black rubber 5/8(15.9mm) ID grommet - in loose parts bag].

Install the 1/2(12.7mm) CPVC street elbow on discharge of trap

Install the black PVC tube connector [ 3/4(18.1mm) PVC x 1/2(12.7mm) CPVC from loose parts bag] as shown in the illustration above.

Cut the black drain tube [5/8(15.9mm) ID - in loose parts bag] to length to fit between trap and tube connector through grommet.

Clamp both ends of the drain tube using clamps provided.

Glue the CPVC street elbow to the trap using appropriate cleaner and solvent cement.

The field supplied 3/4(18.1mm) PVC or 1/2(12.7mm) CPVC drain line vent tee must vent outside the furnace cabinet (see exploded view above).

Note: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

NOTE: “PVC” is used as a generic term. Pipe and fitting materials used must be acceptable to the local code officials hav- ing jurisdiction.