CONCENTRIC VENT

TERMINATION

Vent Termination Clearances

!WARNING

CARBON MONOXIDE POISONING, FIRE AND EXPLOSION HAZARD

Failure to follow this warning could result in personal injury, death, or property damage.

Inlet and outlet pipes may NOT be vented directly above each other (standard vent terminals).

1.

Determine termination locations based on clearances

 

specified in following steps and as shown in Fig. 8, 31

 

through 36

2.

The vent termination must be located at least 12(304.8mm)

 

above ground or normally expected snow accumulation

 

levels.

3.

Do NOT terminate over public walkways. Avoid areas

 

where condensate may cause problems such as above

 

planters, patios, or adjacent to windows where steam may

 

cause fogging.

2.Determine the best location for the termination kit. See Fig. 32 for vertical termination or Fig. 35 and 36 for horizontal termination. Roof termination is preferred since it is less susceptible to damage, has reduced intake contaminants and less visible vent vapor. For side wall termination, consideration should be given to: 1) possible damage from the vapors to plants/shrubs, other equipment and building materials, 2) possible damage to the terminal from foreign objects, 3) wind effects that may cause recirculation of flue products, debris or light snow and 4) visible vent vapor.

Kit Contents:

 

3(76.2)

Rain Cap or 2(50.8) Rain Cap

 

3(76.2)

Diameter SDR--26 Pipe, 191/ (495.3) Long or

 

 

2

 

4(101.6) Diameter SDR--26 Pipe, 24(609.6) Long,

 

2(50.8)

Diameter SDR--26 Pipe, 315/ (803.3) Long or

 

 

8

 

21/2(63.5) Diameter SDR--26 Pipe, 371/8(973) Long,

2(50.8) or 3

3(76.2)

Y Concentric Fitting or 2(50.8) Y Concentric Fitting

(76.2) Dia.

 

 

Rain Cap

Nominal 3(76.2) or 4(101.6) Dia. SDR--26 Pipe

2(50.8) or 3(76.2) Dia.

2 (50.8) or 21/ (63.5)

 

Y Concentric Fitting

2

25--22--03

 

Dia. SDR--26 Pipe

 

 

A07719

Fig. 31 - Kit Components

 

58HDV

4.

The vent termination shall be located at least 4(1.2m)

 

horizontally from any electric meter, gas meter, gas

 

regulator, and any relief equipment. These distances apply

 

ONLY to U.S. installations.

5.

The vent termination is to be located at least 3(.91m) above

 

any forced air inlet located within 10(3m); and at least 10

 

(3m) from a combustion air intake of another appliance,

 

except another direct vent furnace intake.

6.

In Canada, the Canadian Fuel Gas Code takes precedence

 

over the preceding termination instructions.

Concentric Vent Termination

Kit # KGAVT0701CVT & KGAVT0801CVT

For additional venting information contact www.Carrier.com.

These kits are for vertical or horizontal termination of the combustion air inlet and the exhaust vent pipes on Category IV gas-fired condensing furnaces. The KGAVT0701CVT kit can be used for 2(50.8mm) diameter pipe systems. The KGAVT0801CVT kit can be used for 3(76.2mm)diameter pipe

Vent

Combustion

Air

Roof Boot/

Flashing

(Field Supplied)

Vent

Note:

Maintain 12(304.8mm) min. clearance above high- est anticipated snow level. Max. of 24(609.6mm) above roof.

Support

(Field Supplied)

45° Elbow

(Field Supplied)

Combustion

Air

25--22--02

system. Refer to Table 5 for the correct pipe size for the furnace. Both the combustion air inlet and the exhaust vent pipes must attach to the termination kit. The termination kit must terminate outside the structure and must be installed per the instructions outlined below for vertical or horizontal termination. Vertical termination is preferred. Field supplied pipe and fittings are required to complete the installation.

Vertical & Horizontal Termination

1.Determine the pipe diameters required for the installation from Table 5 and Fig. 33

Support must be field installed to secure termination kit to structure.

A07720

Fig. 32 - Concentric Vent Roof Installation

3.Cut one 5(127mm)diameter hole through the structure for the KGAVT0701CVT Kit or one 4(101.6mm)diameter hole for the KGAVT0801CVT Kit .

4.Dimension D may be lengthened to 60(1524mm)max. or shortened by cutting the pipes to 12(304.8mm) min. Dimension A will change according to D dimension. (See Fig. 33.)

31

Page 31
Image 31
Carrier 58HDV installation instructions Concentric Vent Termination, Vertical & Horizontal Termination