Carrier 58HDV installation instructions Horizontal Right through Top See Fig, Exhaust, Inlet

Models: 58HDV

1 52
Download 52 pages 46.64 Kb
Page 25
Image 25
Fig. 18 - Horizontal Right through Top

Trap Connection “Clamp ears”

Single Pressure Switch Detail

Alternate Orientation

3/

(4.8mm) ID Rub-

Pointed OUT

 

16

ber Tube

 

 

AIR FLOW

Plastic Cap

 

 

Yellow or black

 

Coupling & Clamps

 

EXHAUST

Preassemble &

(Optional)

 

insert into furnace

 

 

 

 

 

 

Drain Tube Black

 

 

 

Rubber 1/2(12.7mm)

Vent Drain

 

 

ID & Clamps

& Clamps

 

 

 

 

Field

 

 

 

Supplied Tee

Relief Tube Black Rub-

WARNING

 

Add Cap and Clamp

 

ber 3/

(4.8mm) ID

 

 

 

16

 

 

 

Flexible Tubing Connector

 

 

3/ (4.8mm) OD (Loose

 

 

16

 

 

 

Parts Bag)

 

 

 

 

 

 

Tee Trap White PVC

Relief Tube Extension

 

(loose parts bag)

Black Rubber 3/

(4.8mm) ID

 

 

16

 

INLET

Cut to Fit (Loose Parts Bag)

 

 

 

 

OFF

 

 

 

ON

 

 

 

On Some Models

 

 

 

ONLY

 

 

Dual Pressure Switch

Barbed Coupling 1/ (12.7mm)

 

 

 

 

 

 

2

 

Drain Tube Corrugated 5/ (15.9mm) ID &

OD (Loose Parts Bag)

 

 

8

Drain Tube Black Rubber

 

Clamps Cut at straight section

 

 

 

1/ (12.7mm) ID & Clamps

 

 

 

2

 

 

 

Remove KO before

 

Leave room for clamp

Cut Here

mounting Trap

 

 

 

 

 

25--24--70b

Representative drawing only, some models may vary in appearance.

A07711

Fig. 18 - Horizontal Right through Top

58HDV

Horizontal Right through Top (See Fig. 18)

Disconnect the hoses from the trap assembly, and remove trap and trap mounting bracket from the blower compartment. Using cover plate and gasket provided in the loose parts bag, cover the hole from the burner compartment to the blower compartment and secure with screws.

Remove knockout from the side of the furnace casing where drain tube will exit.

Mount the trap externally to the bottom side of the unit using the two(2) screws provided in the location shown.

Cut the corrugated tube as shown in the illustration above. Connect the corrugated hose from the transition to the trap. Secure connections with clamps.

Connect the black 1/2(12.7mm) ID drain tube from the Vent Drain to the trap. If an extension is required, use the black 1/2(12.7mm) OD barbed coupling and the black 1/2(12.7mm) ID drain tube in the loose parts bag. Cut tube to length. Secure connections with clamps.

Connect the 3/16(4.8mm) ID relief tube to the middle port on the trap. If an extension is required, use the clear 3/16(4.8mm) OD flexible tubing connector and the black 3/16(4.8mm) ID relief tube in the loose parts bag. Cut tube to length.

Cut an appropriate length of 2(50.8mm) PVC pipe, fittings and extension pipe long enough to exit the cabinet and connect the vent drain to a standard field supplied 2(50.8mm) PVC tee

SA 2(50.8mm) PVC coupling fastened onto the drain tee Install tee trap into bottom section of tee and glue pipe.

Connect the tee trap and the main drain line exiting the casing as shown in Fig. 18.

NOTE: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both the external trap and the external tee trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

25

Page 25
Image 25
Carrier 58HDV installation instructions Horizontal Right through Top See Fig, Exhaust, Inlet