Carrier 58HDV Upflow Installations Vent through Left-Side See Fig, Side View

Models: 58HDV

1 52
Download 52 pages 46.64 Kb
Page 19
Image 19

Plastic Cap

Yellow or black

 

INLET

On Some Models

(50.8mm) PVC

ONLY

2

 

 

Coupling

 

 

Coupling & Clamps (Optional)

Vent Drain

& Clamps

Either: The PVC

EXHAUST

 

 

Drain Tee or a field

 

VENT

supplied 2

 

IN

ON

(50.8mm) PVC Tee

 

 

 

 

 

 

OFF

Dual Pressure Switch Detail

 

 

 

AIR FLOW

 

 

 

Tee Trap White PVC

 

 

(loose parts bag)

 

 

Drain Tube

Black Rubber

1/2(12.7mm) ID

& Clamps Drain Tube

Corrugated

Single Pressure Switch

Relief Tube

Black Rubber 3/16

(4.8mm) ID

58HDV

Drain Connector Black PVC 3/4(19.1mm) PVC X 1/2

(12.7mm) CPVC (Loose parts bag)

Casing Grommet Black Rubber

5/8(15.9mm) ID (Loose parts bag)

5/8(15.9mm) ID

& Clamps

Drain Line Vent Tee 3/4(18.1mm) PVC or 1/2

(12.7mm) CPVC (Field supplied)

SIDE VIEW

Rotate downward 5° to 10°

NOTE: Built--in channel will be angled 5° to 10° also.

25--24--67a

Representative drawing only, some models may vary in appearance.

A07707

Fig. 12 - Upflow Installations Vent through Left Side

Upflow Installations Vent through Left-Side (See Fig. 12)

Remove drain tee from inducer discharge and remove black drain tube 1/2(12.7mm) ID from bottom of drain tee.

Install Vent Pipe grommet in side of casing.

Cut an appropriate length of 2(50.8mm) PVC pipe long enough to exit the cabinet and connect the vent drain to either:

SA 2(50.8mm) PVC coupling fastened onto the drain tee Install tee trap into bottom of tee.

Remove knockout from the side of the furnace casing where drain tube will exit.

Install the 1/2(12.7mm) CPVC street elbow on discharge of trap

Install the black PVC drain connector [3/4(19.1mm) PVC x 1/2CPVC from loose parts bag] as shown in the illustration above.

Cut the black drain tube [5/8(15.9mm) ID - in loose parts bag] to length to fit between trap and tube connector through grommet.

Clamp both ends of the drain tube using clamps provided.

Glue the CPVC street elbow to the trap using appropriate cleaner and solvent cement.

Connect the tee trap and the main drain line exiting the casing as shown in Fig. 12

Note: It is recommended that all PVC piping and fitting connections be fit up and inspected before final cementing. Both the internal trap and the external tee trap must be primed before operation. Verify all condensate drain connections are securely clamped. A coupling and clamps (in loose part bag) may be installed as shown for future servicing of the vent system.

19

Page 19
Image 19
Carrier 58HDV installation instructions Upflow Installations Vent through Left-Side See Fig, Side View