Chapter 3 Bringing Up the Cisco IOS XR Software on a Multishelf System

Integrated Switch System

SUMMARY STEPS

1.admin

2.clear controller switch errdisable {port {FE GE} {0 1}} {location node-id}}

3.clear controller switch inter-rack {errdisable {ports {number all} statistics {all ports number}} {location node-id}

DETAILED STEPS

 

Command or Action

Purpose

 

 

 

Step 1

admin

Places the router in administration EXEC mode.

 

Example:

 

 

RP/0/RP0/CPU0:router# admin

 

 

 

 

Step 2

clear controller switch errdisable {port {FE GE}

Clears the err-disable state of the switch port for the

 

{0 1}} {location node-id}}

RP ports.

 

Example:

Use the FE keyword to display the ports for Fast

 

Ethernet (FE).

 

RP/0/RP0/CPU0:router(admin)# clear controller switch

 

 

 

errdisable port GE 1 location f0/sc0/cpu0

Use the GE keyword to display the ports for

 

 

Gigabit Ethernet (GE).

 

 

 

Step 3

clear controller switch inter-rack {errdisable

Clears the err-disable state of the inter-rack switch

 

{ports {number all} statistics {all ports

ports on the 22-port SCGE.

 

number}} {location node-id}

 

 

Example:

 

 

RP/0/RP0/CPU0:router(admin)# clear controller switch

 

 

inter-rack statistics all location f0/sc0/cpu0

 

 

 

 

Verifying the Connections of the Integrated Switch Control Network

This section presents how to verify the connections and operations of the integrated switch control network with 22-port SCGEs:

Verifying the Control Ethernet Connection, page 3-25

Verifying the Port Statistics, page 3-26

Verifying Bidirectionality, page 3-27

Verifying Unidirectional Link Detection (UDLD) Protocol Information, page 3-27

Verifying Spanning Tree Protocol Information, page 3-27

Verifying the Control Ethernet Connection

To verify the control Ethernet connection on intra-rack switches, use the show controllers switch command with the ports and location keywords, as shown in the following example:

RP/0/RP0/CPU0:router(admin)# show controllers switch 0 ports location 0/rp0/Cpu0

 

FE Port

0 : Up, STP State : FORWARDING (Connects to - F0/SC0)

 

FE Port

1 : Up, STP State : FORWARDING (Connects to - F0/SC1)

 

 

Cisco IOS XR Getting Started Guide

 

 

 

 

 

 

OL-10957-02

 

 

3-25

 

 

 

 

 

Page 63
Image 63
Cisco Systems Cisco IOS XR manual Verifying the Control Ethernet Connection