Index
IN-63
Catalyst 3750 SwitchSoftware Configuration Guide
OL-8550-09
described 19-9
restarting migration process 19-28
topology changes 19-14
overview 19-9
port roles
described 19-10
synchronized 19-12
proposal-agreement handshake process 19-11
rapid convergence
cross-stack rapid convergence 19-11
described 19-11
edge ports and Port Fast 19-11
point-to-point links 19-11, 19-27
root ports 19-11
root port, defined 19-10
See also MSTP
running configuration
replacing C-20, C-21
rolling back C-20, C-22
running configuration, saving 3-17
S
SC (standby command switch) 6-11
scheduled reloads 3-24
scheduling, IP SLAs operations 43-5
SCP
and SSH 9-57
configuring 9-58
SDM
switch stack consideration 5-9
templates
configuring 8-6
number of 8-1
SDM mismatch mode 5-10, 8-4
SDM template 41-4
aggregator 8-1
configuration guidelines 8-5
configuring 8-4
desktop 8-1
dual IPv4 and IPv6 8-2
types of 8-1
secondary VLANs 16-2
Secure Copy Protocol
secure HTTP client
configuring 9-56
displaying 9-57
secure HTTP server
configuring 9-55
displaying 9-57
secure MAC addresses
and switch stacks 25-19
deleting 25-17
maximum number of 25-10
types of 25-10
secure ports
and switch stacks 25-19
configuring 25-9
secure remote connections 9-46
Secure Shell
See SSH
Secure Socket Layer
See SSL
security, port 25-9
security features 1-10
See SCP
sequence numbers in log messages 31-8
server mode, VTP 14-3
service-provider network, MSTP and RSTP 19-1
service-provider networks
and customer VLANs 17-2
and IEEE 802.1Q tunneling 17-1
Layer 2 protocols across 17-8
Layer 2 protocol tunneling for EtherChannels 17-9
set-request operation 32-5
setup program
failed command switch replacement 49-11
replacing failed command switch 49-9