6.1Powering Up the System

To power up the system, set the keyswitch to On, or power up the system remotely. The SCM power-up display is shown at the system management console and the control panel, followed by the SRM power-up display.

6.1.1SCM Power-Up Display

Example 6–1 SCM Power-Up Display

SCM_E0> power on

Powering

on

PCI

Box 0

 

Powering

on

PCI

Box 1

 

QBB-0 Powering ON

~I~ Testing OCP Switch passed

 

Power ON Phase INIT

 

QBB-1

Powering ON

 

QBB-2

Powering ON

 

QBB-3

Powering ON

 

SCM_E0>

 

Testing SIO Shared RAM(please wait)

 

Initializing shared ram

 

Shared RAM Initialized

 

Powering ON H-Switch

 

SCM_E0>

 

I~ HSW4/HPM40 SysEvent: HS_INIT_CD1

Reg0:000F Reg1:AB81

Phase 0

I~ Enable HS Links: 0f

~I~ QbbConf(gp/io/c/m)=fbbfffff Assign=ff SQbb0=00 PQbb=00 SoftQbbId=fedcba98

~I~ SysConfig: 37 13 07 19 07 12

c7 13 37 13 f7 11 f7 13 37 13

SCM_E0>

 

I~ HSW4/HPM40 SysEvent: LINK0_ON

Reg0:000F Reg1:AB81

SCM_E0>

 

I~ HSW4/HPM40 SysEvent: LINK1_ON

Reg0:010F Reg1:AB81

SCM_E0>

 

I~ HSW4/HPM40 SysEvent: LINK2_ON

Reg0:030F Reg1:AB81

SCM_E0>

 

I~ HSW4/HPM40 SysEvent: LINK3_ON

Reg0:070F Reg1:AB81

SCM_E0>

 

.............................................................................

.........................................................................

SCM_E0> ......................................

6-2 AlphaServer GS80/160/320 User’s Guide

Page 84
Image 84
Compaq GS160, GS80, GS320 manual Powering Up the System, Example 6-1 SCM Power-Up Display