The B32 central loading control comes in one box. The box should include:
1 Carefully remove the B32 components from
their shipping containers, and set upright.
2 Remove all packing material, protective paper,
tape and plastic.
3 Carefully inspect all components to make sure
no damage occurred during shipping. Notify the shipper immediately if damage is found.
4 Take a moment to record serial numbers,
the software version number and electrical power specifications in the blanks provided on the back of the the User Guide’s title page. The information will be helpful if you ever need service or parts.
5 You are now ready to begin installation.
Follow the preparation steps on the next page, paying particular attention to all wiring consideration and recom- mendations.
INSTALLATION | Basic 32 Loader Control | UGC007/0702 |