You should develop a preventive maintenance schedule for all components in the conveying system to ensure optimum operation and performance.
The B32 may require the following maintenance checks:
•Whenever you change materials
rVerify the loader settings for pump systems or loaders
effected by the material change. Pay particular attention to load times and dump times. See CHANGING LOADER SETTINGS in the Operation section.
•Quarterly
rCheck power and cable connections and wires. Over time, the power and cable connections between the B32 and conveying system components may become loose or wires may become worn. Tighten any loose connections and replace any wire or cable that has become worn or damaged.
MAINTENANCE | Basic 32 Loader Control | UGC007/0702 |