LEAK CHECK AND INSULATING COOLING UNIT OUTLET LINES
1.Check all CO2, plain and carbonated water, and syrup connections for leaks and repair if evident.
2.Make sure Cooling Unit outlet lines connections to insulated python lines are well insulated.
3.Install Cooling Unit top cover and secure with two screws.
DISPENSING STATION ADJUSTMENTS
ADJUSTING WATER FLOW RATE
Refer to Installation Instructions provided with dispensing station for dispensing valve water flow rate adjustment instructions.
ADJUSTING
Adjust dispensing station dispensing valves for Water-
INSTALLING LINE IDENTIFICATION LABEL
Install LABEL, LINE IDENTIFICATION (item 3) on Cooling Unit and record syrup flavors in proper spaces.
13 | 300381000 |