Tapping

Size

Water Boiler

Location

(in)

 

A

4

Supply

 

 

 

B

4

Plug

 

 

 

C

3

Return

 

 

 

D

3

Plug (24-03 thru 24-11)

Return (24-12)

 

 

E

3

Blow-Off / Drain Valve

 

 

 

F

3

Plug

 

 

 

G

1-1/2

Relief Valve

 

 

 

J1

1

Plug

 

 

 

Tapping

Size

Water Boiler

Location

(in)

 

J2

1

Plug

 

 

 

K

3/4

Probe L.W.C.O.

 

 

 

M

3/4

Operating Temperature

Limit Control

 

 

N

3/4

Hi Temperature

Limit Control/Manual Reset

 

 

P

1/2

Plug

 

 

 

Q

1/2

Temperature/Pressure Gauge

(Bush to 1/4")

 

 

S

3/4

Tankless Heater Control

 

 

 

T

3/4

Firing Rate Temperature Control

 

 

 

Figure 26a: Purpose of Tappings - Water Boilers

30

Page 30
Image 30
Crown Boiler 24-11, 24-10, 24-08, 24-12, 24-06, 24-05, 24-09, 24-03, 24-04, 24-07 Purpose of Tappings Water Boilers