TABLE OF CONTENTS - Continued

 

SECTION VI - BURNER SPECIFICATIONS

 

Beckett Burners (Table VI)

57

SECTION VII - REPAIR PARTS & CARTON CONTENTS

 

Regional Office Directory

58

Jacket Assembly

60

Bare Boiler Assembly

62

Steam/Water Trim

65

RTC Related Components

66

SECTION VIII - APPENDIX

A. Application Drawings - Mechanical and Electrical

A1. 3-way RTC in Primary/Secondary – Heating Only/No DHW; with/without Outdoor reset

A2. 3-way RTC in Primary/Secondary – Heating/DHW with/without priority using Tankless coils and Outdoor reset.

A3. 3-way RTC in Primary/Secondary – Heating/DHW with/without priority using Indirect Water Heater and Outdoor reset.

A4. 3-way RTC in Primary/Secondary –Indirect Water Heater as load on primary loop without Outdoor reset.

A5. 3-way Multiple Boiler RTC in Primary/Secondary – Indirect Water Heater (or other heat exchanger) as Load on Primary Loop using Sequencer and Outdoor Reset.

A6. Tankless Application Only with boiler circulation loop. No building heating load.

A7. Indirect Water Heater Only with boiler circulation loop. No building heating load.

B.Boiler Circulator and Diverting Valve Selection Charts B1. S24, 20 and 40 ∆Τ − Taco

B2. S24, 20 and 40 ∆Τ − Grundfos

B3. S24, 20 and 40 ∆Τ − Bell and Gossett

B4. S24, 20 and 40 ∆Τ - Armstrong

C.Valve and Actuator Mounting Instructions

7

Page 7
Image 7
Crown Boiler 24-03, 24-11, 24-10, 24-08, 24-12, 24-06, 24-05, 24-09, 24-04, 24-07 installation instructions Table of Contents