A4. 3-way RTC in Primary/Secondary – Heating and DHW using Indirect Water Heater on Primary Loop; without Outdoor Reset (ELECTRICAL)

77

NOTES:

1)Refer to the I&O to determine correct valve orientation and actuator wiring.

2)120 VAC supplying the RTC should be separate from the burner/boiler circuit.

3)Heat demand can be any electrical signal consisting of 24 – 240 VAC.

4)Use isolation relays for circulators greater than 1/3 HP. Use motor starters for 3 phase circulators.

5)System Pump (P3) to be operated by zone relay or other installer supplied device.

This diagram is for reference only. The installer or designer is responsible for the proper selection and design of the system.

Page 77
Image 77
Crown Boiler 24-03, 24-11, 24-10, 24-08, 24-12, 24-06, 24-05, 24-09, 24-04, 24-07 installation instructions