DSL-522T ADSL Router User Guide

Front Panel Display

Place the Router in a location that permits an easy view of the LED indicators on the front panel.

The LED indicators on the front panel include Power, Status, ADSL, Ethernet, and USB. The ADSL, Ethernet, and USB indicators monitor link status and activity (Link/Act).

 

Power

 

Steady green light indicates the unit is powered on. When the device is

 

 

powered off this remains dark.

 

 

 

 

 

 

 

 

 

 

Lights steady green during power on self-test (POST). Once the connection

 

Status

 

status has been settled, the light will blink green. If the indicator lights steady

 

 

green after the POST, the system has failed and the device should be

 

 

 

 

 

 

rebooted.

 

 

 

 

 

 

 

Steady green light indicates a valid ADSL connection. This will light after the

 

ADSL (Link/Act)

 

ADSL negotiation process has been settled. A blinking green light indicates

 

 

 

activity on the WAN (ADSL) interface.

 

 

 

 

 

Ethernet (Link/Act)

 

A solid green light indicates a valid link on startup. This light will blink when

 

 

there is activity currently on the Ethernet port.

 

 

 

 

 

 

 

 

USB (Link/Act)

 

Steady green light indicates a valid USB connection. A blinking green light

 

 

indicates activity on the USB interface.

 

 

 

 

 

 

 

3

Page 13
Image 13
D-Link DSL-522T manual Front Panel Display