CAUTION
•Do not tilt cabinets more than 10° from vertical.•Lift the cabinet only with a forklift or damage may occur.NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (see Table
1.If not already accomplished, use a forklift or pallet jack to move the cabinet to the installation area, or as close as possible, before unloading from the pallet. Insert the forklift or pallet jack forks from the right side of the cabinet, between the supports on the bottom of the pallet (see Figure
2.Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts securing the bracket to the pallet (see Figure
3.Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts securing the bracket to the pallet (see Figure
4.Using the forklift, raise the UPS cabinet section until the cabinet bottom clears the pallet by approximately 3 mm.
5.Once the UPS cabinet is clear of the pallet, pull the pallet from under the UPS cabinet. Discard or recycle the pallet in a responsible manner.
6.Using the forklift, move the UPS cabinet to the final installed location.
7.Carefully lower the UPS cabinet until the cabinet base contacts the floor.
8.If permanently mounting the system, proceed to Step 9; otherwise, continue to Step 11.
9.Using the retained hardware, reinstall the shipping brackets removed in Steps 2 and 3 to the left and right side of the UPS cabinet with the angle facing outward (see Figure
10.Secure the cabinet to the floor with
11.If installing a battery cabinet, proceed to paragraphs 3.3; otherwise, proceed to paragraph 3.4.
22 | UPS 450 - 550 kVA (2x225 - 2x275 kVA) | 1027574 |
| User’s and Installation Guide | Revision B |