5 UPS operating instructions

This section describes how to operate the UPS.

NOTE

Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has been performed by authorized service personnel.The preliminary startup verifies

all electrical interconnections to ensure the installation was successful and the system operates properly.

NOTE

Read this section of the manual and have thorough knowledge of UPS operation before attempting to operate any of the controls.

NOTE

The UPS displays two minutes of battery runtime at the initial startup. After a 24-hour charging period, the UPS automatically runs a battery test and the correct battery runtime displays.

48

UPS 450 - 550 kVA (2x225 - 2x275 kVA)

1027574

 

User’s and Installation Guide

Revision B