NOTE If the load requires a neutral, a bypass source neutral must be provided. If the load does not require a neutral and there is no neutral conductor connected at the bypass input, a neutral to ground bonding jumper must be installed. DO
NOT install both a source neutral and a bonding jumper.
Figure
46 | UPS 450 - 550 kVA (2x225 - 2x275 kVA) | 1027574 |
| User’s and Installation Guide | Revision B |