Emerson MPR25 Installation and start-up procedures, Tools and test equipment, Step, Action

Models: MPR15 Series MPR25

1 120
Download 120 pages 55.76 Kb
Page 41
Image 41
Installation and start-up procedures

41

Installation and start-up procedures

Tools and test equipment

The following tools and test equipment are required:

Potentiometer screwdriver Bourns Inc. No. 32

Potentiometer screwdriver Bourns Inc. No. 60

Screwdriver 3 inch

Digital voltmeter - Fluke 8000 A or equivalent

Dummy load

Installation procedure

Procedure 1 - Power shelf installation

Step

Action

 

 

1

Position the power shelf against the rack.

 

 

2

Fasten the shelf in the position indicated on the drawings (normally

 

directly below the Controller or below another power shelf).

3

Release the clamping bar from the front of the power shelf (Refer to

 

Figures 10, 11 and 12).

4

Remove the AC junction box cover (left side) and store for re-

 

installation.

5

Remove the DC and control wiring area cover (right side) and store for

 

re-installation.

 

–end–

25A Switch Mode RectifierNT5C06B / C Installation and User Manual

Page 41
Image 41
Emerson MPR25 Installation and start-up procedures, Tools and test equipment, Installation procedure, Step, Action