Emerson MPR15 Series, MPR25 user manual Parallel verification, Danger

Models: MPR15 Series MPR25

1 120
Download 120 pages 55.76 Kb
Page 64
Image 64
Parallel verification

64 Installation and start-up procedures

Parallel verification

Note 1 : The following does not apply to rectifier shelf applications with the hot stand-by option. For delayed start shelf applications, wait after the delay expires before performing the next step.

Note 2 : All the rectifiers in the shelf or system must have been individually adjusted as indicated in the Power up, HVSD adjustment, FLT adjustment and Equalize adjustment procedures before proceeding with the following steps.

DANGER

When adding or replacing a rectifier verify that the rectifier

DC and AC circuit breakers are in the OFF position.

Reconnect the sense leads (if disconnected before the rectifier power-up) for all the shelf rectifiers

by connecting the quick tab of TB-1 on the shelf or

re-installing the sense fuse (system application) or

setting the dip switches to the ON position (system application)

UM5C06B / C ( 169-2071-500 ) P0711722 Standard 10.00 May 2001

Page 64
Image 64
Emerson MPR15 Series, MPR25 user manual Parallel verification, Danger