INSTALLATION

Diagram 5

The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

Note: If installing termination on a siding covered wall, a vinyl siding standoff or furring strips must be used to ensure that the termination is not recessed into the siding.

7)Before connecting the horizontal run of vent pipe to the vent termination, slide the Wall Thimble (Part # 1247) over the vent pipe.

8)Slide the appliance and vent assembly towards the wall carefully inserting the vent pipe into the vent cap assembly. It is important that the vent pipe extends into the vent cap sufficient distance so as to result in a minimum pipe overlap of 1-1/4 inches. Secure the connection between the vent pipe and the vent cap by attaching the two sheet metal strips extending from the vent cap assembly into the outer wall of the vent pipe. Use the two sheet metal screws provided to connect the strips to the pipe section. See Diagram 6.

VERTICAL

TERMINATION

1) M a i n t a i n

t h e 1 - 1 / 2 "

clearances

(air spaces) to

combustibles when passing through ceilings, walls, roofs, enclosures, attic rafter, or other nearby combustible surfaces. Do not pack air spaces with insulation. Check the "Venting Arrangements

- Vertical Temination" section

for the maximum vertical rise of the venting system and the maximum horizontal offset limitations.

2) Set the gas appliance in its desired location. Drop a Diagram 1

plumb bob down from the ceiling to the position of the

appliance fl ue exit, and mark the location where the vent will penetrate the ceiling. Drill a small hole at his point. Next, drop a plumb bobfromtherooftotheholepreviouslydrilled in the ceiling, and mark the spot where the vent will penetrate the roof. Determine if ceiling joists, roof rafters or other framing will obstruct the venting system.

You may wish

to relocate the appliance or to

offset,asshown in Diagram 2

to avoid cutting load bearing members.

Diagram 2

4)Assemble the desired lengths of pipe and elbows. Ensure that all pipes and elbow connections are in the fully twist-locked position and sealed.

5)Cut a hole in the roof centered on the small drilled hole placed in the roof in Step 2. The hole should be of sufficient size to meet the minimum requirements for clearance to combustibles of 1-1/2". Slip the fl ashing under the shingles (shingles should overlap half the fl ashing) as per Diagram 4.

Diagram 4: The upper half of the fl ashing is installed under the roofi ng material and not nailed down until the chimney is installed. This allows for small adjustments.

6)Continue to assemble pipe lengths.

Note: If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet, to avoid excessive stress on the elbows,andpossibleseparation. Wall straps are available for this purpose (Diagram 2).

Galvanizedpipeisdesirableabovetheroofline duetoitshighercorrosionresistance.Continue to add pipe sections through the flashing until the height of the vent cap meets the minimum height requirements specified in Diagram 5 or local codes. Note that for steep roof pitches,

Diagram 6

9) Installwallthimble in the center of the 11" square and attach with wood screws (Diagram 7).

Diagram 7

Note: Apply sealant "Mill-Pac" to inner pipe and high temperature silicone sealant to outer pipe on every twist- lock joint.

3)A Firestop spacer must be installed in the fl oor or ceiling of every level. To install the Firestop spacer in a fl at ceiling or wall, cut a 11 inch square hole. Frame the hole as shown in Diagram 3 and install the fi restop.

Diagram 3

Diagram 5

Roof Pitch

 

 

Minimum Vent Height

 

 

 

 

Feet

Meters

fl at to 7/12

 

 

2

0.61

over 7/12 to 8/12

 

 

2

0.61

over 8/12 to 9/12

 

 

2

0.61

over 9/12 to 10/12

 

 

2.5

0.76

over 10/12 to 11/12

 

 

3.25

0.99

over 11/12 to 12/12

 

 

4

1.22

over 12/12 to 14/12

 

 

5

1.52

over 14/12 to 16/12

 

 

6

1.83

over 16/12 to 18/12

 

 

7

2.13

over 18/12 to 20/12

 

 

7.5

2.29

over 20/12 to 21/12

 

 

8

2.44

 

 

 

 

 

Excalibur® P95-3 Zero Clearance Direct Vent Gas Fireplace

21

Page 21
Image 21
Excalibur electronic P95-LP3, P95-NG3 installation manual Vertical Termination, Continue to assemble pipe lengths