Owners
Installation Manual
P95-3Zero Clearance Direct Vent Gas Fireplace
Congratulations
To the New Owner
TABLE OF CONTENTS
MAINTENANCE
WARRANTY
SAFETY LABEL
SAFETY LABEL
Copy of Safety Decal for P95-3
REQUIREMENTS
MA Code - CO Detector
5.08 Modifications to NFPA-54,Chapter
OBSTRUCTIONS
INSTALLATION
GENERAL SAFETY INFORMATION
INSTALLATION CHECKLIST
IMPORTANT MESSAGE SAVE THESE INSTRUCTIONS
INSTALLATION
Diagram
LOCATING YOUR GAS FIREPLACE
MANUFACTURED MOBILE HOME ADDITIONAL REQUIREMENTS
INSTALLATION
Framing Dimensions
COMBUSTIBLE MANTELS
FRAMING AND FINISHING
INSTALLATION
FACING REQUIREMENT
HEARTH REQUIREMENTS
4 Note The unit does not
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
Pins
VENTING INTRODUCTION
3Horizontal vent must be supported every 3 feet
INSTALLATION
VENTING
INSTALLATION
EXTERIOR VENT TERMINATION LOCATIONS
INSTALLATION
Flat Wall Installation
Corner Installation
SIMPSON DURA-VENTVENTING
INSTALLATION
SIMPSON DURA-VENTVENTING COMPONENTS LIST
Description
Description
INSTALLATION
VENTING ARRANGEMENTS - HORIZONTAL TERMINATIONS
SIMPSON DURA-VENTDIRECT VENT GS SYSTEM and
FPI DIRECT VENT SYSTEM FLEX
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Horizontal Venting with Three 3 90o Elbows
Option
INSTALLATION
Vertical Venting with Two 2 90o Elbows
Vertical Venting with Three 3 90o Elbows
Option
INSTALLATION
VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
SIMPSON DURA-VENTDIRECT VENT GS SYSTEM
Vent must be supported at offsets
INSTALLATION
Vent must be supported at offsets
INSTALLATION
UNIT INSTALLATION WITH HORIZONTAL TERMINATION
Diagram
Diagram
INSTALLATION
Diagram
Diagram
Diagram
INSTALLATION
INSTALLATION PROCEDURES
GS 8 Nominal Diameter ID
Offset
INSTALLATION
PILOT ADJUSTMENT
GAS LINE INSTALLATION
GAS PIPE PRESSURE TESTING
INSTALLATION
FOR P95-3USING SIT 820 NOVA GAS VALVE
Installation of LPG Conversion Kit
CONVERSION KIT# 773-969FROM NG TO LP
INSTALLATION
Installation of the DC Sparker
Ignitor Wire
DC Sparker Ignitor Wire
INSTALLATION
Installer Notice
Ground wire from kit
Battery Compartment
INSTALLATION
LOG SET INSTALLATION
Pins on the rear log support
OPTIONAL BRICK PANELS
INSTALLATION
306
Notch Pin
Rest log against bracket306 Rear Log
INSTALLATION
GLASS DOOR INSTALLATION
Fit the bottom brackets over the pins on the base
OPTIONAL SCREEN DOORS
INSTALLATION
ACCENT KIT INSTALLATION
SINGLE DOOR ACCENTS
DOUBLE DOOR ACCENTS
INSTALLATION
REMOTE CONTROL
WALL SWITCH
wall switch wire to a 120V wire
INSTALLATION
WIRING DIAGRAMS
INSTALLATION
OPERATING INSTRUCTIONS
SHUTDOWN PROCEDURE
AERATION ADJUSTMENT
LIGHTING PROCEDURE
OPERATING INSTRUCTIONS
NORMAL OPERATING SOUNDS OF GAS APPLIANCES
Blower
Burner Tray
MAINTENANCE
MAINTENANCE INSTRUCTIONS
LOG REPLACEMENT
GOLD-PLATEDDOOR Or SURROUND
MAINTENANCE
FAN MAINTENANCE
1Shut the power off
Diagram
MAINTENANCE
INSTALLING VALVE
1Shut the power off
Valve Tray Assembly
Description
PARTS LIST
P95-3MAIN ASSEMBLY
PARTS LIST
Description
PARTS LIST
P95-3BURNER ASSEMBLY & LOG SET
PARTS LIST
P95-3FLUSH FRONT ACCESSORIES
Description
Description
WARRANTY
THE WARRANTY LIMITED LIFETIME
Conditions
Exclusions
See the inside back cover for details