- 11 -
FIGURE 1
UPPER HANDLE MOUNTING
3.8 Route the t hrottle cable along the right side of the upper handle, through t he clip,
under the fuel tank suppor t, and position the cable on t he left side of the engine.
Attach thr ottle cable to eng ine:
a) Position the throttle control lever (located on console) ¼” (6mm) from t he upper
end of t he slot .
b) Attach inner wire of the throttle cable to the t op hole in t he throttle cont r ol lever
as shown in Figure 2.
c) Loosen the clamp, place t he cable behind it, and pull on the cable to m ove the
throttle linkage to the f ull t h r ot tle position. Tighten the cable clam p scr ew.
FIGURE 2
SPEED CONTROL (THROTTLE CABLE HOOK- UP)
3.9 Connect the PT O engagement linkages. Loosen j am nut and remove turnbuckle
fr om lower link age. Screw turnbuckle onto both upper and lower link ages
simultaneously. (See figure 3) Note that the threads on upper linkage ar e left
hand. See 5.2.2 for linkage adjust ment.
Note: ECS handles have the PTO linkage on the inside of the PTO engagem ent
lever tab and the hairpin on t he out side.
FIGURE 3
PTO ENGAGEMENT LINKAGE