Figure 7 shows the connections for
1.Connect the voltage test leads to the outputs of the voltage transformers (VTs).
2.In PQ Log, select the measuring range with the matching nominal voltage and
3.Enter the correct converter/transformer ratio for current and voltage.
egb007.bmp
Figure 8. PQ Log Settings for a 16 kV Network