1744/1743

Users Manual

Total power:

Total power P, P, D, S

3-wattmeter method

2-wattmeter method (Aron circuitry)

2 ½ wattmeter method

Applications

Power quality:

Voltage quality analysis according to EN 50160 over a 1-week period (time-activated job)

Examination of measurement quantities per standards

Disturbance analysis:

Long-term analysis of line power voltage

Examination of voltage dips, swells, and harmonic problems

Flicker measurement

Examination of ripple control signals (level)

Specific search for disturbances through correlation of relevant logging quantities (e.g. current, voltage, and flicker), time of occurrence, periodicity

Network Optimization:

Load logging

Current logging (with Flexi Set 5 to 3000 A or clamps 1 to 1000 A)

Capture of current peaks

56